Closed
30
hHPS/RFQ20171514
Single Lot
Request for Quotation Method
Non-consultancy services
Zimbabwe PPDPA Act Rules
Internally Generated Funds
HWANGE POWER STATION
Installation, Repair & Maintenance of Irrigation Equipment and Accessories,Mechanical and Structural Engineering (incl. steel fabrication, steel roof and coverings, machining, sewage management, dewatering, etc.)
1 Month(s)
ZIMBABWE POWER COMPANY
29-Aug-2026 08:41 AM
RECONDITION OF SHAFT
| Project Name: RECONDITION OF SHAFT |
| Description: RECONDITION OF SHAFT |
| Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
|---|---|---|---|---|---|
| 1 | 73181000 | Machining services | RECONDITION THE SUPPLIED SHAFT AS PER SUPPLIED DRAWING AS FOLLOWS- 1. CHECK FOR TRUENESS OF THE SHAFT FIRST BEFORE RECONDITIONING CAN COMMENCE. GIVE FEEDBACK TO ZPC FIRST ON THE RUNOUT CHECKS. 2. THE PROCESS MUST BE CHROME PLATING AND GRINDING TO A FINAL BEARING JOURNALS TO 120.05mm +0.02/0.00 3. ENSURE PROPER BONDING IS ATTAINED PRIOR TO GRINDING TO THE FINAL DIMENSIONS ON BOTH BEARING JOURNALS MARKED (X) ON THE DRAWING. 4. ENSURE THE LOCKING THREADS ARE FULLY RESTORED AS PER DRAWING. | 1 | Work |