AFC/RFQ/CC 115/2026


Single Lot


Request For Quotation Method


Non-complex works


Zimbabwe PPDPA Act Rules


Internally Generated Funds


mvurwi, mt darwin and kotwa branches


Borehole Siting, Casing and Drilling Equipment,Borehole Siting, Casing, Drilling and Repairs


21 Day(s)


AFC HOLDINGS


27-Oct-2026 10:36 AM

AFC HOLDINGS

Hurudza House, Harare

Harare, Harare, Zimbabwe EMEA


BOREHOLE DRILLING AND PLUMBING WORKS AT MT DARWIN, MVURWI AND KOTWA BRANCHES

Project Name:
BOREHOLE DRILLING AND PLUMBING WORKS AT MT DARWIN, MVURWI AND KOTWA BRANCHES
Description:

boreholes

Line Item Details
Item No. UNSPSC Lot Name Lot Description Quantity Unit of Measure
1 71112102 Borehole geometry logging services Borehole drilling at AFC Kotwa branch SCOPE OF WORKS FOR BOREHOLE DRILLING • Siting costs • Drilling up to 40m cost • Charge per metre for drilling after 40m • Accessories costs – electric pump installation • class 9/10 casing per metre, • double casing per metre • 0.75HP submersible pump installation, control box, pressure tank and pipework connections • ZINWA Levy • 5000 Litre tank installation • 4.5 meters steel tank stand NB Pipe works should run from the water tank right into the building and the water supply to the kitchen and bathrooms should be tested for efficiency adequacy 1 Each
2 71151323 Borehole image processing Borehole drilling at AFC Mvurwi branch SCOPE OF WORKS FOR BOREHOLE DRILLING • Siting costs • Drilling up to 40m cost • Charge per metre for drilling after 40m • Accessories costs – electric pump installation • class 9/10 casing per metre, • double casing per metre • 0.75HP submersible pump installation, control box, pressure tank and pipework connections • ZINWA Levy • 5000 Litre tank installation • 4.5 meters steel tank stand NB Pipe works should run from the water tank right into the building and the water supply to the kitchen and bathrooms should be tested for efficiency adequacy 1 Each
3 71112325 Borehole seismic land acquisition services Borehole drilling at AFC Mt Darwin Branch SCOPE OF WORKS FOR BOREHOLE DRILLING • Siting costs • Drilling up to 40m cost • Charge per metre for drilling after 40m • Accessories costs – pump installation • class 9/10 casing per metre, • double casing per metre • 0.75HP submersible pump installation, control box, pressure tank and pipework connections • ZINWA Levy • 5000 Litre tank supply and installation • 4.5 meters steel tank stand 1 NB Pipe works should run from the water tank right into the building and the water supply to the kitchen and bathrooms should be tested for efficiency adequacy 1 Each
  -