Failed
60
ZPC/HPS/ESP 000011
Single Lot
Direct Procurement Method
Non Consulting Services
Zimbabwe PPDPA Act Rules
Internally Generated Funds
HWANGE POWER STTAION
Plant and Equipment Maintenance
60 Day(s)
30-Oct-2024 08:33 PM
UNIT 5 BOILER INTEGRITY ASSESSMENT AND SCOPING BY BABCOCK NTUTHUKO ENGINEERING AT HWANGE POWER STATION
Project Name: UNIT 5 BOILER INTEGRITY ASSESSMENT AND SCOPING BY BABCOCK NTUTHUKO ENGINEERING AT HWANGE POWER STATION |
Description: UNIT 5 BOILER INTEGRITY ASSESSMENT AND SCOPING BY BABCOCK NTUTHUKO ENGINEERING AT HWANGE POWER STATION |
Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
---|---|---|---|---|---|
1 | 77101501 | Risk or hazard assessment | comprehensive walkdown of boiler 5 and outlining the specific scope of work required for its return to service. | 1 | Work |
2 | 77101501 | Risk or hazard assessment | Non - destructive testing , Internal and external inspections, 4. Mechanical and structural assessments, Electrical and instrumentation checks | 1 | Work |