Tender Details

  Closed



30


RFQZ/1164/2025


Single Lot


Competitive Bidding Method


Goods


Zimbabwe PPDPA Act Rules


Devolution Funds


MARONDERA RDC


Tools and Hardware


3 Day(s)


MARONDERA RURAL DISTRICT COUNCIL


05-Mar-2025 12:04 PM

MARONDERA RURAL DISTRICT COUNCIL

4.5km peg North Road

Marondera, Mashonaland East , Zimbabwe EMEA


MAHUSEKWA BARRICADE AND WARD 12 HALL

Project Name:
MAHUSEKWA BARRICADE AND WARD 12 HALL
Description:

MAHUSEKWA BOTTLE STORE

Line Item Details
Item No. UNSPSC Lot Name Lot Description Quantity Unit of Measure
1 30101500 Angles 40x40 square topping heavy duty for Steel Barricade with a perimeter of 245m 44 Each
2 30101500 Angles 0x5mm Flat Bars for steel barricade with a perimeter of 245m 44 Each
3 27000000 Tools and General Machinery 14mm Deformed Bars for steel barricade in Mahusekwa with a perimeter of 245m 443 Each
4 46151501 Barricades 50x50mm Square Tubing heavy duty for steel barricade in Mahusekwa with a perimeter of 245m 39 Each
5 46151501 Barricades Cutting Disc for steel barricade in Mahusekwa with a perimeter of 245m 15 Each
6 46151501 Barricades Grinding Disc for steel barricade in Mahusekwa with a perimeter of 245m 5 Each
7 30102400 Rod VIETMAX RODS for steel barricade in Mahusekwa with a perimeter of 245m 25 kg
8 60121001 Paintings PAINT for steel barricade in Mahusekwa with a perimeter of 245m 20 Litre
9 60121001 Paintings RED OXIDE for steel barricade in Mahusekwa with a perimeter of 245m 20 Litre
10 60121001 Paintings THINNERS for steel barricade in Mahusekwa with a perimeter of 245M 12 Litre
11 30111601 Cement Cement for steel barricade in Mahusekwa with a perimeter of 245m 10 Each
12 90101502 Bars deformed bars 16mm for ward 12 community hall construction 10 Each
13 27000000 Tools and General Machinery builders line for ward 12 community hall construction 2 Each
14 27000000 Tools and General Machinery Nails 1.5 for ward 12 community hall construction 10 kg
15 27000000 Tools and General Machinery DPC 230mm for ward 12 community hall construction 15 Each
16 27000000 Tools and General Machinery DPC 115mm for ward 12 community hall construction 10 Each
17 27000000 Tools and General Machinery Brickforce 230mm for ward 12 community hall construction 20 Each
18 27000000 Tools and General Machinery Brickforce 115mm for ward 12 community hall construction 20 Each
19 27000000 Tools and General Machinery Black polyethene 250microns for ward 12 community hall construction 200 Sq M
20 27000000 Tools and General Machinery cement 42.5 for ward 12 community hall construction 250 Each
  -
  View all activity

05-Mar-2025 01:00 PM


07-Mar-2025 03:00 PM


10-Mar-2025 12:45 PM

  Preview




  0
  32