Closed
60
ZPC/HPS/ RBM 03/2025
Single Lot
Restricted Bidding Method
Non Consulting Services
Zimbabwe PPDPA Act Rules
Internally Generated Funds
HWANGE POWER STATION
Testing and Inspection Services
30 Day(s)
ZIMBABWE POWER COMPANY
28-May-2025 03:46 PM
PROVISION OF NON DESTRUCTIVE TESTS (NDTS) SERVICES DURING UNIT 5 OUTAGE AT HWANGE POWER STATION
Project Name: PROVISION OF NON DESTRUCTIVE TESTS (NDTS) SERVICES DURING UNIT 5 OUTAGE AT HWANGE POWER STATION |
Description: PROVISION OF NON DESTRUCTIVE TESTS (NDTS) SERVICES DURING UNIT 5 OUTAGE AT HWANGE POWER STATION |
Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
---|---|---|---|---|---|
1 | 73121614 | Non destructive testing service | 3RD PART INDEPENDENT INSPECTOR The 3rd Part Independent Inspector shall carry out the following scope of work and supply as when and where required on the boiler and turbine parts; • Supply all test equipment and consumables, • Ultrasonic flaw detection on boiler and turbine parts, • Magnetic particle test on boiler and turbine parts, • Dye penetrant test on boiler and turbine parts, • Witness boiler pressure test, • Issue reports of all tests carried out • Provide accommodation and subsistence for officers for the duration of their stay • Provide own transport to and from work site during the statutory outage. • Supply NDT consumables • Produce reports for the NDTs carried out | 1 | Work |
2 | 73121614 | Non destructive testing service | 4TH PART INDEPENDENT INSPECTOR The 4th Part Independent Inspector (Interpreter) shall carry out the following scope of work on the boiler right hand furnace walls; • Carry out quality checks on all NDTs and welding works during the outage • Interpret results from NDTs and visual inspections done during the outage and advice on the repair plans • Produce a conclusive report as a deliverable • Provide accommodation and subsistence for officers for the duration of their stay Provide own transport to and from work site during the statutory outage | 1 | Work |