hwange power station
New Plant and Equipment
2 Month(s)
ZIMBABWE POWER COMPANY
06-Jun-2025 03:24 PM
Supply, Delivery, Installation and Commissioning of Oil Free Compressors at Hwange Power Station (Re-tender)
Project Name: Supply, Delivery, Installation and Commissioning of Oil Free Compressors at Hwange Power Station (Re-tender) |
Description: Supply, Delivery, Installation and Commissioning of Oil Free Compressors at Hwange Power Station (Re-tender) |
Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
---|---|---|---|---|---|
1 | 40151600 | Compressors | 2-Stage Oil-Free Rotary Screw Air-end Compressors Water Cooled after-cooler with moisture separator Power- 150kW Power Supply- 380V/50Hz Starter- Integral star delta starter Working Air Pressure- 8.5 Bar Discharge Volume- 24.6 m3/min IP rating- IP 55 Automatic start & stop control Finger touch control Intellisys TM controller Maximum- 79 dB(A) Low sound enclosure | 2 | Each |
2 | 40151600 | Compressors | Install and commission the compressors | 1 | Each |
3 | 40151600 | Compressors | Onsite operating and maintenance training to Hwange Operating, maintenance and engineering staff | 1 | Each |