Closed
90
ZPC/HPS/DPA00033
Single Lot
Direct Procurement Method
Work (Non Complex Works)
Zimbabwe PPDPA Act Rules
Internally Generated Funds
HWANGE POWER STATION
Construction and Civil Works (buildings, dams, roads etc.) (New)
30 Day(s)
ZIMBABWE POWER COMPANY
11-Jun-2025 04:32 PM
PROVISION OF PIPELINE CONSTRUCTION SERVICES AT HWANGE POWER STATION
Project Name: PROVISION OF PIPELINE CONSTRUCTION SERVICES AT HWANGE POWER STATION |
Description: PROVISION OF PIPELINE CONSTRUCTION SERVICES AT HWANGE POWER STATION |
Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
---|---|---|---|---|---|
1 | 95121640 | Pipeline | Using own tools, equipment and consumables excavate and construct parallel to the existing line a 10km pipeline with pipes and fittings of DN 960mm provided ZPC, | 10 | KM |
2 | 95121640 | Pipeline | Using own tools, equipment and consumables excavate and construct parallel to the existing line a 3km pipeline with pipes and fittings of DN 800mm provided ZPC | 3 | KM |