Closed
90
ATZ028/2024
Single Lot
Competitive Bidding Method
Work (Non Complex Works)
Zimbabwe PPDPA Act Rules
Internally Generated Funds
28489 St. Ives, Chinhoyi and
Stand No 897, Bindura
Construction and Civil Works (buildings, dams, roads etc.) (New)
3 Month(s)
ALLIED TIMBERS ZIMBABWE
15-Jul-2024 03:05 PM
Construction of Perimeter Wall for Chinhoyi and Bindura Branches
Project Name: Construction of Perimeter Wall for Chinhoyi and Bindura Branches |
Description: Construction of Perimeter Wall for Chinhoyi and Bindura Branches |
Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
---|---|---|---|---|---|
1 | 95000000 | Land and Buildings and Structures and Thoroughfares | Lot 1-Construction of Chinhoyi Perimeter Wall | 1 | Each |
2 | 95000000 | Land and Buildings and Structures and Thoroughfares | Lot 2-Construction of Bindura Perimeter Wall | 1 | Each |