Electronic Government Procurement System of Zimbabwe
Tender Details
Published
90
TIMB/BOR/038/2025
Single Lot
Competitive Bidding Method
Work (Complex Works)
Zimbabwe PPDPA Act Rules
Regular Agency Fund
Mashonaland West, Mashonaland East, Manicaland,
Mashonaland Central
Borehole Siting, Casing and Drilling Equipment
2 Month(s)
TOBACCO INDUSTRY MARKETING BOARD
10-Nov-2025 04:05 PM
TOBACCO INDUSTRY MARKETING BOARD
429 Gleneagles Rd, Harare
Harare, Harare, Zimbabwe EMEA
SITING, DRILLING AND COMMISSIONING OF SOLAR POWERED BOREHOLES IN MASHONALAND CENTRAL, MASHONALAND WEST, MASHONALAND EAST AND MANICALAND.
Project Name: SITING, DRILLING AND COMMISSIONING OF SOLAR POWERED BOREHOLES IN MASHONALAND CENTRAL, MASHONALAND WEST, MASHONALAND EAST AND MANICALAND.
Description:
BACKGROUND
TIMB intends to drill and equip boreholes with solar-powered pumping systems at selected beneficiary schools. Table below shows the identified schools and their location.
Sadoma Extension Secondary School, the school is in Makonde District, and it is located 86km from Chinhoyi CBD.
Mukanganise Secondary School is located at Wangamela Farm, Marondera District, and some 90 km from Harare.
Nyamukamani Secondary School is in Chendambuya, Manicaland; 167km from Harare
Mapako Primary school is around 165km from Harare in Matepatepa Farming Community.
OBJECTIVES
To provide reliable, sustainable, and clean water supply to beneficiary institutions.
To utilize renewable energy solutions (solar power) to reduce operational costs and ensure environmental sustainability.
To promote community ownership and long-term functionality of the water systems.
SCOPE OF WORK
The contractor shall be responsible for:
Site Assessment and Mobilization
Conduct hydrogeological surveys to confirm drilling points.
Mobilize drilling equipment and materials.
Borehole Drilling and Development
Drill boreholes to depths determined by hydrogeological survey.
Install appropriate casing and screens.
Develop borehole to achieve maximum sustainable yield.
Water Quality Testing
Conduct water sampling and testing for potability in line with Zimbabwean standards.
Solar Pumping System Installation
Supply and install solar panels, submersible pumps, controllers, and all necessary fixtures.
Provide a secured solar mounting structure.
Supply and install a 10 000l water storage tank.
Construct (brick) tank stand and distribution points (taps).
Capacity Building and Training
Train local community/school representatives on system operation and routine maintenance.
Post-Installation Support
Provide operation manuals and warranties for pumps and solar equipment.
Offer a minimum 12-month defects liability period.
4. DELIVERABLES
Fully functional solar-powered borehole at each designated site.
Water quality test certificates.
Technical report including drilling logs, yield test results, and GPS coordinates of borehole.
Handover and commissioning report signed by TIMB, community representatives, and contractor.
5. DURATION
The works should be completed within 2 months from site handover.
Line Item Details
Item No.
UNSPSC
Lot Name
Lot Description
Quantity
Unit of Measure
1
71112329
Borehole seismic while drilling acquisition services
Siting, Drilling And Commissioning Of Solar Powered Borehole In Mashonaland Central,
Mapako Primary school is around 165km from Harare in Matepatepa Farming Community
1
Each
2
71112329
Borehole seismic while drilling acquisition services
Construction of Classroom Blocks in Mashonaland West,
Sadoma Extension Secondary School, the school is in Makonde District, and it is located 86km from Chinhoyi CBD
1
Each
3
71112329
Borehole seismic while drilling acquisition services
Construction of Classroom Blocks in Mashonaland East
Mukanganise Secondary School is located at Wangamela Farm, Marondera District, and some 90 km from Harare.
1
Each
4
71112329
Borehole seismic while drilling acquisition services
Construction of Classroom Blocks in Manicaland
Nyamukamani Secondary School is in Chendambuya, Manicaland; 167km from Harare