Tender Details

  Published



90


TIMB/CON/037/2025


Single Lot


Competitive Bidding Method


Work (Complex Works)


Zimbabwe PPDPA Act Rules


Regular Agency Fund


MASHONALAND CENTRAL, MASHONALAND WEST, MASHONALAND EAST AND MANICALAND


Construction and Civil Works (buildings, dams, roads etc.) (New)


4 Month(s)


TOBACCO INDUSTRY MARKETING BOARD


11-Nov-2025 12:03 PM

TOBACCO INDUSTRY MARKETING BOARD

429 Gleneagles Rd, Harare

Harare, Harare, Zimbabwe EMEA


PROVISION OF CONSTRUCTION OF CLASSROOM BLOCKS IN MASHONALAND CENTRAL, MASHONALAND WEST, MASHONALAND EAST AND MANICALAND

Project Name:
PROVISION OF CONSTRUCTION OF CLASSROOM BLOCKS IN MASHONALAND CENTRAL, MASHONALAND WEST, MASHONALAND EAST AND MANICALAND
Description:

PROVISION OF CONSTRUCTION OF CLASSROOM BLOCKS IN MASHONALAND CENTRAL, MASHONALAND WEST, MASHONALAND EAST AND MANICALAND

Scope of Works and Technical specifications

BACKGROUND

TIMB intends to construct classroom blocks in line with the ATTACHED approved Government designs and Bills of Quantities. Table below shows the identified schools and their location.

Mashonaland West

Mashonaland East

Manicaland

Mashonaland Central

Sadoma Extension Secondary School, the school is in Makonde District, and it is located 86km from Chinhoyi CBD.

 

Mukanganise Secondary School is located at Wangamela Farm, Marondera District, and some 90 km from Harare.

Nyamukamani Secondary School is in Chendambuya, Manicaland; 167km from Harare

Mapako Primary school is around 165km from Harare in Matepatepa Farming Community.

 

 

 

OBJECTIVES

 

  • To provide quality and durable classroom infrastructure that enhances access to education.
  • To ensure compliance with approved Government classroom block designs and specifications.
  • To promote accountability, transparency, and value for money in the implementation of the project.

 

SCOPE OF WORK

The contractor shall be responsible for:

 

1. Pre-construction activities

  • Site clearance, setting out, and mobilization.
  • Verification of measurements against approved BoQ and plan.

2. Construction works

  • Construction of classroom block(s) according to provided drawings and specifications.
  • Adherence to approved Bill of Quantities and material specifications.
  • Structural works include foundations, walls, roofing, finishes, electrical, and plumbing (where applicable).

3. Compliance & Standards

  • Ensure all works meet Zimbabwean building standards and Ministry of Public Works guidelines.
  • Incorporate safety, environmental protection, and sustainability considerations.

4. Post-construction activities

  • Site clean-up and proper disposal of waste.
  • Defects liability period (minimum 6 months) with provisions for corrections.

5. Deliverables

  • Completed classroom block(s) as per design and BoQ.
  • Progress reports (monthly).
  • Final project completion report including as-built drawings.
  • Handover certificate signed by TIMB, Ministry of Education, and contractor.

 

  1. Duration

The project is expected to be completed within 3 - 4 months from the date of site handover.

 

  1. Budget

The project budget will be guided by the approved Bill of Quantities

Scope of Works and Technical specifications

BACKGROUND

TIMB intends to construct classroom blocks in line with the ATTACHED approved Government designs and Bills of Quantities. Table below shows the identified schools and their location.

Mashonaland West

Mashonaland East

Manicaland

Mashonaland Central

Sadoma Extension Secondary School, the school is in Makonde District, and it is located 86km from Chinhoyi CBD.

 

Mukanganise Secondary School is located at Wangamela Farm, Marondera District, and some 90 km from Harare.

Nyamukamani Secondary School is in Chendambuya, Manicaland; 167km from Harare

Mapako Primary school is around 165km from Harare in Matepatepa Farming Community.

 

 

 

OBJECTIVES

 

  • To provide quality and durable classroom infrastructure that enhances access to education.
  • To ensure compliance with approved Government classroom block designs and specifications.
  • To promote accountability, transparency, and value for money in the implementation of the project.

 

SCOPE OF WORK

The contractor shall be responsible for:

 

1. Pre-construction activities

  • Site clearance, setting out, and mobilization.
  • Verification of measurements against approved BoQ and plan.

2. Construction works

  • Construction of classroom block(s) according to provided drawings and specifications.
  • Adherence to approved Bill of Quantities and material specifications.
  • Structural works include foundations, walls, roofing, finishes, electrical, and plumbing (where applicable).

3. Compliance & Standards

  • Ensure all works meet Zimbabwean building standards and Ministry of Public Works guidelines.
  • Incorporate safety, environmental protection, and sustainability considerations.

4. Post-construction activities

  • Site clean-up and proper disposal of waste.
  • Defects liability period (minimum 6 months) with provisions for corrections.

5. Deliverables

  • Completed classroom block(s) as per design and BoQ.
  • Progress reports (monthly).
  • Final project completion report including as-built drawings.
  • Handover certificate signed by TIMB, Ministry of Education, and contractor.

 

  1. Duration

The project is expected to be completed within 3 - 4 months from the date of site handover.

 

  1. Budget

The project budget will be guided by the approved Bill of Quantities

 

 

Line Item Details
Item No. UNSPSC Lot Name Lot Description Quantity Unit of Measure
1 60141006 Building blocks Construction of Classroom Blocks in Mashonaland Central, Mapako Primary school is around 165km from Harare in Matepatepa Farming Community 1 Each
2 60141006 Building blocks Construction of Classroom Blocks in Mashonaland West, Sadoma Extension Secondary School, the school is in Makonde District, and it is located 86km from Chinhoyi CBD 1 Each
3 60141006 Building blocks Construction of Classroom Blocks in Mashonaland East Mukanganise Secondary School is located at Wangamela Farm, Marondera District, and some 90 km from Harare. 1 Each
4 60141006 Building blocks Construction of Classroom Blocks in Manicaland Nyamukamani Secondary School is in Chendambuya, Manicaland; 167km from Harare 1 Each
  -