COB/WSD/3MVA/01/2025
Single Lot
Competitive Bidding Method
Non Consulting Services
Zimbabwe PPDPA Act Rules
Internally Generated Funds
NCEMA PUMP STATION
Electrical Products: Cables and Materials, Power Back-Up Equipment, Transformers, Standby Generators, Consumables & Accessories,Installation, Repair & Maintenance of Electrical Equipment, Generators, Power Back-Up Equipment & Miscellaneous Electrical Repair Works
30 Day(s)
24-Nov-2025 04:29 PM
REPAIR WORKS OF A LEAKING 3MVA 88KV TRANSFORMER AT NCEMA PUMP STATION
| Project Name: REPAIR WORKS OF A LEAKING 3MVA 88KV TRANSFORMER AT NCEMA PUMP STATION |
| Description: REPAIR WORKS OF A LEAKING 3MVA 88KV TRANSFORMER AT NCEMA PUMP STATION |
| Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
|---|---|---|---|---|---|
| 1 | 15121505 | Transformer oil or insulating oil | Collect oil samples before service and after service for testing x 2 Transformers | 2 | Lump Sum |
| 2 | 15121505 | Transformer oil or insulating oil | Disconnect LT cables x 2 Transformers | 2 | Lump Sum |
| 3 | 15121505 | Transformer oil or insulating oil | Disconnect HT cables x 2 Transformers | 2 | Lump Sum |
| 4 | 15121505 | Transformer oil or insulating oil | Disconnect tertiary transformer feeder cables x 2 Transformers | 2 | Lump Sum |
| 5 | 15121505 | Transformer oil or insulating oil | Replace gaskets and cone seals on LT bushings on both HV transformer and tertiary transformer x 2 Transformers | 2 | Lump Sum |
| 6 | 15121505 | Transformer oil or insulating oil | Replace gaskets and cone seals on HT bushings on both HV transformer and tertiary transformer x 2 Transformers | 2 | Lump Sum |
| 7 | 15121505 | Transformer oil or insulating oil | Replace HV bushings with new ones x 1 transformer | 3 | Each |
| 8 | 15121505 | Transformer oil or insulating oil | Terminate 6.6kV LV cable x 2 Transformers | 2 | Lump Sum |
| 9 | 15121505 | Transformer oil or insulating oil | Terminate tertiary transformer feeder cable x 2 Transformers | 2 | Lump Sum |
| 10 | 15121505 | Transformer oil or insulating oil | Re tighten all connections feeding and outgoing from the transformer x 2 Transformers | 2 | Lump Sum |
| 11 | 15121505 | Transformer oil or insulating oil | Properly mount all external mechanical support structures, e.g. structures supporting bushings and cables x 2 Transformers | 2 | Each |
| 12 | 15121505 | Transformer oil or insulating oil | Change silica gel x 2 Transformers | 2 | Each |
| 13 | 15121505 | Transformer oil or insulating oil | Perform surge arrestor tests- ground terminal to ground and visual mechanical damage inspection x 2 Transformers | 2 | Lump Sum |
| 14 | 15121505 | Transformer oil or insulating oil | Change membrane on pressure release valves and carry out visual mechanical damage tests x 2 Transformers | 2 | Lump Sum |
| 15 | 15121505 | Transformer oil or insulating oil | Connect LT cables x 2 Transformers | 2 | Lump Sum |
| 16 | 15121505 | Transformer oil or insulating oil | Connect HT cables x 2 Transformers | 2 | Lump Sum |
| 17 | 15121505 | Transformer oil or insulating oil | Regenerate transformer oil both on 3MVA transformer and tertiary transformer x 2 Transformers | 2 | Lump Sum |
| 18 | 15121505 | Transformer oil or insulating oil | Change or fill up mercury in bulchoz relay (where necessary) and perform dry air tests x 2 Transformers | 2 | Lump Sum |
| 19 | 15121505 | Transformer oil or insulating oil | Test 3MVA transformer to ZETDC standards – to be done by ZETDC x 2 Transformers | 2 | Lump Sum |
| 20 | 15121505 | Transformer oil or insulating oil | Test tertiary transformer to ZETDC standards – to be done by ZETDC x 2 Transformers | 2 | Lump Sum |
| 21 | 15121505 | Transformer oil or insulating oil | Clean transformers externally, clean the the substation and supply weed killer. x 2 Transformers | 2 | Lump Sum |
| 22 | 15121505 | Transformer oil or insulating oil | Paint the transformers x 2 Transformers | 2 | Lump Sum |
| 23 | 15121505 | Transformer oil or insulating oil | Commission the transformers x 2 Transformers | 2 | Lump Sum |