HWANGE POWER STATION
Plant and Equipment Maintenance
60 Day(s)
09-Aug-2024 08:07 AM
THE RETUBING OF UNIT 2 BFP B LUB OIL COOLER AT HWANGE POWER STATION
Project Name: THE RETUBING OF UNIT 2 BFP B LUB OIL COOLER AT HWANGE POWER STATION |
Description: THE RETUBING OF UNIT 2 BFP B LUB OIL COOLER AT HWANGE POWER STATION |
Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
---|---|---|---|---|---|
1 | 20122512 | Tubing guides | Dismantling of oil cooler and removing old tube nest. | 1 | Work |
2 | 20122512 | Tubing guides | Replacement of tube nest with new one having same new tubes, end plates and baffle plates as per given in technical specification of the cooler. | 1 | Work |
3 | 20122512 | Tubing guides | A coating of tubes to prevent external corrosion, which can be achieved by a protective plating though immersion in a metal bath at a low point of fusion with zinc, lead or tin. | 1 | Work |
4 | 20122512 | Tubing guides | To carry out the Hydraulic pressure test at 12bars and hold for 24 hrs. | 1 | Work |
5 | 20122512 | Tubing guides | Any other work required to repairing of cooler tube shell. | 1 | Work |
6 | 20122512 | Tubing guides | Cleaning of tube shell and Painting tube shell body by enamel paint- two coats. | 1 | Work |