Published
90
MRDC/RW/09/2026
Single Lot
Competitive Bidding Method
Non-complex works
Zimbabwe PPDPA Act Rules
Internally Generated Funds
MANYAME RURAL DISTRICT COUNCIL
Borehole Siting, Casing and Drilling Equipment,Borehole Siting, Casing, Drilling and Repairs
1 Year(s)
MANYAME RURAL DISTRICT COUNCIL
20-Mar-2026 04:54 PM
BOREHOLE DRILLING
| Project Name: BOREHOLE DRILLING |
| Description: PROCUREMENT OF BOREHOLE DRILLING AND SOLARISATION |
| Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
|---|---|---|---|---|---|
| 1 | 71151323 | Borehole image processing | Supply and Installation of Complete solar powered borehole spares. (Include apron construction). Assume depth of installation is 36-metres NB Quote items separately including storage tank, stand, solar panels, pump etc) DC Pump Set 270W 24V 1.8m3/hr DC submersible pump Dry run sensor Storage Tank set 5000L PVC food grade tank Installation Accessories 3 core 2.5mm flex cable, 2 core 1mm flex cable, manhole cover, borehole plate socket, DB Box with stand, safety rope, HDPE 40mm pipe, PVC 40mm pipe, garden tap, fittings, sundries 4m stand with Solar bracket Fittings and Civils External Digital Control box 2X 330W solar panels Labour Pump installation and testing Tank installation Mobilisation Labour | 30 | Each |
| 2 | 71151323 | Borehole image processing | Borehole drilling and Type B bush pump installation Mobilisation and demobilisation of equipment to/from site Site borehole location Drill borehole up to depth of 60-metres. (Include borehole development for at least 3 hours, pumping test, gravel packing and casing with slotted 140mm uPVC class 9/10 down to bottom) Drill additional depth up to 80-metres. (Include borehole development for at least 3 hours, pumping test, gravel packing and casing with slotted 140mm uPVC class 9/10 down to bottom)) Provide rate for additional depth deeper than 80-metres. (Include borehole development for at least 3 hours, pumping test, gravel packing and casing with slotted 140mm uPVC class 9/10 down to bottom) Borehole flushing and casing | 30 | Each |
