Published
60
MM/VTP/15/26
Single Lot
Competitive Bidding Method
Goods
Zimbabwe PPDPA Act Rules
Internally Generated Funds
MARONDERA
Water And Sewer Engineering and Utilities
1 Year(s)
MUNICIPALITY OF MARONDERA
30-Apr-2026 03:01 PM
SUPPLY AND INSTALLATION OF 3 VERTICAL TURBINE PUMPS
| Project Name: SUPPLY AND DELIVERY OF VERTICAL TURBINE WATER PUMPS |
| Description: SUPPLY AND INSTALLATION OF 3 VERTICAL TURBINE PUMPS INCLUDING VALVES, MOTORS , ELECTRICAL BOARD AND ALL OTHER ACCESSORIES |
| Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
|---|---|---|---|---|---|
| 1 | 40151526 | Turbine pumps | SUPPLY AND INSTALLATION OF 600 M3 /HR VERTICAL TURBINE WITH 107M HEAD AND IMMERSION DEPTH OF 19.95M FOR RAW WATER(APE)C/W MOTOR AND ELECTRICAL BOARD -NON-RETURN VALVE TO SUIT PUMP DISCHARGE -SLUICE/BUTTERFLY VALVE TO SUIT DISCHARGE | 1 | Each |
| 2 | 40151526 | Turbine pumps | SUPPLY AND INSTALLATION OF 600 M3/HR VERTICAL TURBINE PUMP WITH 16M HEAD AND IMMERSION DEPTH OF 8M FOR RAW WATER-C/W MOTOR AND ELECTRICAL BOARD(APE) -NON-RETURN VALVE TO SUIT PUMP DISCHARGE -GATE VALVE TO SUIT PUMP DISCHARGE -MODIFICATION OF PIPEWORK TO SUIT NEW PUMP -FABRICATION AND INSTALLATION OF NEW BASE, BOLTS,NUTS AND ASSOCIATED ACCESSORIES | 1 | Each |
| 3 | 40151526 | Turbine pumps | SUPPLY AND INSTALLATION OF 600M3/HR VERTICAL TURBINE PUMP WITH 100M HEAD, IMMERSION DEPTH OF 4M, C/W MOTOR AND ELECTRICAL BOARD(APE) -NON-RETURN VALVE TO SUIT DISCHARGE -SLUICE/BUTTERFLY VALVE TO SUIT DISCHARGE -MODIFICATION OF PIPE WORK TO SUIT PUMP -FABRICATION OF BASE TO SUIT PUMP -BOLTS, NUTS AND ASSOCIATED ACCESSORIES | 1 | Each |
View all activity
01-May-2026 01:34 PM
02-Jul-2026 02:00 PM
30-Apr-2026 05:22 PM
Preview
0
1300
150
0
14
