Closed
30
20168456
Single Lot
Request For Quotation Method
Non-consultancy services
Zimbabwe PPDPA Act Rules
Internally Generated Funds
HWANGE
Cleaning Services (for Office & High Rise Buildings) ,Plant and Equipment Maintenance
15 Day(s)
ZIMBABWE POWER COMPANY
02-Jun-2026 01:26 PM
PROVISION FOR ASH DAM TOE FILTER DAMS
| Project Name: PROVISION FOR ASH DAM TOE FILTER DAMS |
| Description: PROVISION FOR ASH DAM TOE FILTER DAMS |
| Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
|---|---|---|---|---|---|
| 1 | 72102902 | Landscaping services | Provision of 15 general workers LABOUR CHARGES FOR TOE WALL FILTER DRAIN MAINTENANCE FOR A PERIOD OF 4 WEEKS 1. SCOPE OF WORK The scope of work, which shall be carried out by the Contractor, includes but is not limited to the cleaning, clearing and maintaining of drains to avert clogging from accumulation of weeds, debris, grass, algae, fine ash and grit etc. The contractor is to ensure unhindered flow from each and every drain outlet whose layout is outlined below; • The filter outlets are at every 6m interval along the dam walls • Stage 1 toe filters are spread over a length of 1.8km • The contractor shall also attend to the grounds around the stage 1 night storage dam as directed by the Engineer (grass cutting and removal of shrubs) • Stage 2 toe filters are spread over a length of 2.9km a. The Contractor shall provide and use own tools and equipment for the execution of the work. b. The Client shall provide the Contractor with storage of the tools and equipment on site. c. The | 1 | Work |
