Closed
30
8756
Single Lot
Direct Procurement Method
Goods
Zimbabwe PPDPA Act Rules
Regular Agency fund
Harare Institute of Technology
Tools and Hardware
60 Day(s)
HARARE INSTITUTE OF TECHNOLOGY
07-Jul-2026 11:23 AM
Construction materials
| Project Name: Construction materials |
| Description: MATERIALS |
| Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
|---|---|---|---|---|---|
| 1 | 23251805 | Forge die | Forge die | 5 | Each |
| 2 | 23251701 | Forge shear press | Forge shear press | 100 | Each |
| 3 | 40171705 | Forged steel pipe adapter | Forged steel pipe adapter | 100 | Each |
| 4 | 40171802 | Forged steel pipe angle face ring | Forged steel pipe angle face ring | 5 | Each |
| 5 | 23153420 | Wire and cable assembly machine | Wire and cable assembly machine | 40 | Each |
| 6 | 23301501 | Wire and cable cutting and terminal assembly equipment | Wire and cable cutting and terminal assembly equipment | 10 | Each |
| 7 | 39121722 | Wire and cable pulling device | Wire and cable pulling device | 10 | Each |
| 8 | 26121538 | Wire assembly | Wire assembly | 10 | Each |
| 9 | 41113652 | Wire assembly board | Wire assembly board | 25 | Each |
| 10 | 44102806 | Wire binding machine | Wire binding machine | 15 | Each |
