Failed
30
BYO 048/26
Single Lot
Request For Quotation method
Non-consultancy services
Zimbabwe PPDPA Act Rules
Regular Agency Fund
102 FORT STREET, ZIMDEF HOUSE, MEZZANINE FLOOR, BULAWAYO
Air Conditioners and Refrigerator Maintenance Services
7 Day(s)
08-Jul-2026 02:22 PM
Electrical & Hydronic Isolation of Airedale air-cooled chiller, at ZIMDEF HOUSE, BYO
| Project Name: Electrical & Hydronic Isolation of Airedale air-cooled chiller, at ZIMDEF HOUSE, BYO |
| Description: Electric and Hydronic Isolation |
| Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
|---|---|---|---|---|---|
| 1 | 72151004 | Hydronics heating system maintenance and repair service | Physically trace chilled water flow and return lines from chiller to pumps | 1 | Work |
| 2 | 72151004 | Hydronics heating system maintenance and repair service | Identify, tag and confirm function of all valves on chiller flow | 1 | Work |
| 3 | 72151004 | Hydronics heating system maintenance and repair service | Trace and confirm the chiller isolator and confirm no shared circuit | 1 | Work |
| 4 | 72151004 | Hydronics heating system maintenance and repair service | Switch off the chiller Isolator and put a tag close traced flow and return valves | 1 | Work |
| 5 | 72151004 | Hydronics heating system maintenance and repair service | Close traced flow and return valves | 1 | Work |
| 6 | 72151004 | Hydronics heating system maintenance and repair service | Drain chiller barrel and keep dry | 1 | Work |
