Tender Details

  Published



90


COB/WSD/E31/05/2026


Single Lot


Competitive Bidding Method


Goods


Zimbabwe PPDPA Act Rules


Procuring Entity Internal Budget Funding


KHAMI ROAD MAIN STORES


Electrical Products: Cables and Materials, Power Back-Up Equipment, Transformers, Standby Generators, Consumables & Accessories,Installation, Repair & Maintenance of Electrical Equipment, Generators, Power Back-Up Equipment & Miscellaneous Electrical Repair Works


50 Day(s)


CITY OF BULAWAYO


14-Jul-2026 09:05 AM

CITY OF BULAWAYO

Corner Fife Street and Leopold Takawira Avenue

Bulawayo, Bulawayo , Zimbabwe EMEA


SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF HUMAN INTERFACE SCREEN FOR FLOWSERVE

Project Name:
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF HUMAN INTERFACE SCREEN FOR FLOWSERVE
Description:

SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF HUMAN INTERFACE SCREEN FOR FLOWSERVE

Line Item Details
Item No. UNSPSC Lot Name Lot Description Quantity Unit of Measure
1 20101601 Screens PRELIMINARIES AND GENERAL Allow for site mobilization, preparation of engineering shop drawings, risk assessments, safety management plans, and technical method statements. 1 Lump Sum
2 20101601 Screens PRELIMINARIES AND GENERAL Provision of structured on-site technical training for municipal staff covering HMI menu navigation, basic software operation, and diagnostic troubleshooting. 5 Number
3 20101601 Screens DECOMMISSIONING WORKS Extraction, verification, and offline digital archiving of legacy HMI software applications, tag databases, and communication profiles. NB- The decommissioned HMI unit to remain with all it’s data uninterrupted. 1 Each
4 20101601 Screens DECOMMISSIONING WORKS Electrical isolation, disconnection of 24VDC power and field communication networks, and removal of the existing legacy HMI unit from the panel 1 Each
5 20101601 Screens DECOMMISSIONING WORKS Anti-static ESD packaging, tagging with hardware inventory identifiers, and safe handover of legacy hardware to designated client storage. 1 Each
6 20101601 Screens EQUIPMENT SUPPLY & HARDWARE INSTALLATION Supply and delivery to site of a new SIMATIC HMI TP1200 Comfort Panel (6AV2124-0MC01-0AX0) or approved equivalent. 1 Each
7 20101601 Screens EQUIPMENT SUPPLY & HARDWARE INSTALLATION Supply and installation of a rugged programming and troubleshooting machine as well as essential HMI hardware accessories, including an industrial screen protector, heavy-duty Cat6 PROFINET patch cables, and mounting gaskets. 1 Each
8 20101601 Screens EQUIPMENT SUPPLY & HARDWARE INSTALLATION Mechanical modification of the existing panel door cutout, including the supply and installation of a Siemens-approved adapter plate to achieve an IP65 perimeter seal. 1 Each
9 20101601 Screens EQUIPMENT SUPPLY & HARDWARE INSTALLATION Physical mounting of the new HMI unit into the control panel using standard tension clamps, and termination of 24VDC power and field network communication cables. 1 Each
10 20101601 Screens SOFTWARE INTEGRATION &PROGRAMMING Migration, recompilation, and firmware optimization of the extracted source application within TIA Portal / WinCC Comfort to natively match the new HMI architecture. 1 Lump Sum
11 20101601 Screens SOFTWARE INTEGRATION &PROGRAMMING Software configuration and network mapping of device ID tags, IP/PROFINET addresses, and Modbus registers to interface with the core pump PLC and Soft Starter. 1 Lump Sum
12 20101601 Screens SOFTWARE INTEGRATION &PROGRAMMING Development and configuration of localized HMI specialized operational graphics screens for Flowserve pump control (including control interfaces, real-time sensor readouts, data logging, and alarm displays). 1 Lump Sum
13 20101601 Screens TESTING AND COMMISSIONING Execution of Pre-Commissioning loop checks, grounding verification, and physical communication link testing. 1 Lump Sum
14 20101601 Screens TESTING AND COMMISSIONING Live Site Acceptance Testing (SAT), including loop calibration checks, interlock trip testing, and live functional commissioning under actual pump operational loads. 1 Lump Sum
15 20101601 Screens TESTING AND COMMISSIONING Handover of compiled O&M manuals, test/calibration certificates, and unencrypted source code backup files on a physical USB drive. 1 Lump Sum
  -
  View all activity

14-Jul-2026 10:30 AM

Prebid Conference:
20-Jul-2026 10:00 AM


Municipal offices, City Hall Building, Upper foyer Bulawayo


12-Aug-2026 11:45 AM


14-Jul-2026 12:25 PM

  Preview




  0
  10