PRESSING OUT AND IN

Project Name:
PRESSING OUT AND IN
Description:
  • Press out gearbox coupling half (shaft approx -134mm), face and press in
  • Press out a pinion shaft coupling half (shaft-6 inch) and Face it
  • Installation of a bearing on the pinion shaft (the newdrive side) and press in the coupling half
Line Item Details
Item No. UNSPSC Lot Name Lot Description Quantity Unit of Measure
1 73180000 Machining and processing services Press out gearbox coupling half (shaft approx. -134mm), face and press in 1 Each
2 73181000 Machining services Press out a pinion shaft coupling half (shaft-6 inch) and Face it 1 Each
3 31390000 Machinings Installation of a bearing on the pinion shaft (the new drive side) and press in the coupling half 1 Each
  -