Closed
60
ZPC/HPS/DPA20350
Single Lot
Direct Procurement Method
Non Consulting Services
Zimbabwe PPDPA Act Rules
Internally Generated Funds
HWANGE
Plant and Equipment Maintenance
3 Month(s)
ZIMBABWE POWER COMPANY
06-Feb-2025 03:59 PM
PROVISION OF STAGE 2 BOILER MAINTENANCE SERVICES
Project Name: PROVISION OF STAGE 2 BOILER MAINTENANCE SERVICES |
Description: PROVISION OF STAGE 2 BOILER MAINTENANCE SERVICES |
Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
---|---|---|---|---|---|
1 | 72151000 | Boiler and furnace construction and maintenance services | PROVISION OF ST 2 BOILER MAINTENANCE SERVICES All Boiler pressure parts including boiler tubes, headers, steam drum, steam piping and headers. All boiler valves including drum valves, superheater valves, reheater valves, economizer valves, attemporator valves, soot blower valves, drain valves, strainers and feed valves up to the Main Steam Stop Valve (MSSV). All insulation and cladding. Boiler structural supports. All soot blowers and associated systems. Air preheaters. All fans (ID fans, FD fans, PA fans, Seal Air, Core Air Fans) including drives and vane control system Draught ducts and expansion joints (excluding ESP inlet and outlet) All boiler dampers excluding actuators PF conveyancing system from classifier outlet to PF burners (including air registers and core air assembly) Scaffolding, rigging and welding service of boiler boiler (including milling plant) Coal feeders The Contractor shall arrange for expert visits for expert inspections, assessment and resolving defects | 1 | Work |